1. Install and test the management subsystem. The management subsystem can monitor and manage the entire integrated wiring system in real time to improve the reliability and efficiency of network communication. Security subsystem Security subsystem refers to the system that protects the entire integrated wiring system.
2. Trunk subsystem: The trunk subsystem should be composed of trunk cables and optical cables from the equipment room to the telecommunications room, the building wiring equipment (BD) installed between the equipment and the equipment cables and jumpers.
3. Working area (terminal) subSystem: It is composed of the connection of the soft cable of the information socket and the terminal equipment, including assembly, connection and expansion of the soft cable, and them are built between the input and output sockets and the equipment terminals. Among them, the information socket is divided into wall, floor, table and soft base type.
The scope of the six major subsystems of integrated wiring and their functions: the work area subsystem is an independent area that needs to set up the terminal, that is, a work area. The work area subsystem should be composed of the information socket of the wiring (horizontal) wiring system, connecting cables and adapters extending to the workstation terminal equipment. .
[Answer]: B There are six subsystems in the structured integrated cabling system, which are: work area subsystem: the purpose is to realize the connection between the work area terminal equipment and the horizontal subsystem, which is composed of cables connected to the terminal equipment to the information socket.
The integrated wiring system includes the following six subsystems: the work area subsystem. Horizontal subsystem. Manage the subsystem. Vertical trunk subsystem. Equipment room subsystem. Subsystem of the building complex.
According to the requirements of the entire integrated wiring system, the horizontal subsystem should be connected to the wiring equipment of the secondary handover room, handover room or equipment room to form a telephone, data, TV system and monitoring system, and facilitate management.
Connect the horizontal wiring subsystem and vertical trunk cable of each floor, and be responsible for connecting and controlling other subsystems. It is composed of cross-connection, interconnection and I/O equipment, which can locate communication lines and facilitate the management of communication lines.
The integrated wiring system is usually composed of six parts: the working area subsystem, the horizontal subsystem, the trunk subsystem, the equipment room subsystem, the management subsystem and the building complex trunk subsystem.
The reality of each subsystemThe current functions are as follows: The workspace subsystem consists of a connection cable and adapter extending the information socket of the wiring (horizontal) wiring system to the workstation terminal equipment. Each workspace is set up with a telephone interface and 1 to 2 computer terminal interfaces according to user requirements.
According to the structural characteristics of the building, the best wiring scheme will be adopted.
's needs. The laying methods adopted by the wiring subsystem of the building complex mainly include overhead wiring, lane wiring, direct buried wiring, underground pipeline wiring, or any combination of these four laying methods. Among them, the laying method of underground pipe wiring can provide the best mechanical protection for the cable, which is the most ideal way.Therefore, choose option C.
Only connect to the information socket management room. In the integrated wiring system, the horizontal trunk subsystem consists of 4 pairs of UTP (unshielded twisted pair), which can support most modern communication equipment. If there is magnetic field interference or information retention, the twisted pair can be shielded. If high-bandwidth applications are required, optical cables can be used.
Direct buried pipe type. First, go through the inner line groove of the ceiling, and then go through the branch pipe to the information exit.
After the underground pipe groove system is built at the same time as the building, its routing and location generally cannot be changed. Therefore, when designing, the pipe groove system should have a certain degree of flexibility.
The horizontal subsystem The wiring pipe of the horizontal subsystem consists of two parts: one part is the bus channel where the horizontal transmission medium is placed on each floor, and the other part is the branch pipe or wire channel that leads the transmission medium to the information interface of each room. A transitional connection is required from the bus channel to the branch channel or pipe.
The wiring distance of the building complex subsystem is mainly determined by the distance between the two buildings. Generally, 1M of cable is reserved in each outdoor wiring well. There are four types of cable laying methods for building subsystems: overhead wiring method, direct buried wiring method, underground pipeline wiring method and tunnel cable wiring method.
In the building complex pipeline system, the average spacing of the junction well is about 180m, or the junction well is set at the main junction point. The junction well can be prefabricated or on-site pouring. Which kind of junction well should be indicated in the structural scheme.
If it is the introduction method of underground pipelines (including the introduction method of direct buried cables or direct buried optical cables through steel pipes), it is because the introduction pipeline passes through the main body or load-bearing structure of the building. To this end, in the engineering design and construction of the integrated wiring system, it is necessary to closely contact with the housing architectural design and construction units to cooperate with the negotiation to solve the following problems.
APAC special tariff HS code listings-APP, download it now, new users will receive a novice gift pack.
1. Install and test the management subsystem. The management subsystem can monitor and manage the entire integrated wiring system in real time to improve the reliability and efficiency of network communication. Security subsystem Security subsystem refers to the system that protects the entire integrated wiring system.
2. Trunk subsystem: The trunk subsystem should be composed of trunk cables and optical cables from the equipment room to the telecommunications room, the building wiring equipment (BD) installed between the equipment and the equipment cables and jumpers.
3. Working area (terminal) subSystem: It is composed of the connection of the soft cable of the information socket and the terminal equipment, including assembly, connection and expansion of the soft cable, and them are built between the input and output sockets and the equipment terminals. Among them, the information socket is divided into wall, floor, table and soft base type.
The scope of the six major subsystems of integrated wiring and their functions: the work area subsystem is an independent area that needs to set up the terminal, that is, a work area. The work area subsystem should be composed of the information socket of the wiring (horizontal) wiring system, connecting cables and adapters extending to the workstation terminal equipment. .
[Answer]: B There are six subsystems in the structured integrated cabling system, which are: work area subsystem: the purpose is to realize the connection between the work area terminal equipment and the horizontal subsystem, which is composed of cables connected to the terminal equipment to the information socket.
The integrated wiring system includes the following six subsystems: the work area subsystem. Horizontal subsystem. Manage the subsystem. Vertical trunk subsystem. Equipment room subsystem. Subsystem of the building complex.
According to the requirements of the entire integrated wiring system, the horizontal subsystem should be connected to the wiring equipment of the secondary handover room, handover room or equipment room to form a telephone, data, TV system and monitoring system, and facilitate management.
Connect the horizontal wiring subsystem and vertical trunk cable of each floor, and be responsible for connecting and controlling other subsystems. It is composed of cross-connection, interconnection and I/O equipment, which can locate communication lines and facilitate the management of communication lines.
The integrated wiring system is usually composed of six parts: the working area subsystem, the horizontal subsystem, the trunk subsystem, the equipment room subsystem, the management subsystem and the building complex trunk subsystem.
The reality of each subsystemThe current functions are as follows: The workspace subsystem consists of a connection cable and adapter extending the information socket of the wiring (horizontal) wiring system to the workstation terminal equipment. Each workspace is set up with a telephone interface and 1 to 2 computer terminal interfaces according to user requirements.
According to the structural characteristics of the building, the best wiring scheme will be adopted.
's needs. The laying methods adopted by the wiring subsystem of the building complex mainly include overhead wiring, lane wiring, direct buried wiring, underground pipeline wiring, or any combination of these four laying methods. Among them, the laying method of underground pipe wiring can provide the best mechanical protection for the cable, which is the most ideal way.Therefore, choose option C.
Only connect to the information socket management room. In the integrated wiring system, the horizontal trunk subsystem consists of 4 pairs of UTP (unshielded twisted pair), which can support most modern communication equipment. If there is magnetic field interference or information retention, the twisted pair can be shielded. If high-bandwidth applications are required, optical cables can be used.
Direct buried pipe type. First, go through the inner line groove of the ceiling, and then go through the branch pipe to the information exit.
After the underground pipe groove system is built at the same time as the building, its routing and location generally cannot be changed. Therefore, when designing, the pipe groove system should have a certain degree of flexibility.
The horizontal subsystem The wiring pipe of the horizontal subsystem consists of two parts: one part is the bus channel where the horizontal transmission medium is placed on each floor, and the other part is the branch pipe or wire channel that leads the transmission medium to the information interface of each room. A transitional connection is required from the bus channel to the branch channel or pipe.
The wiring distance of the building complex subsystem is mainly determined by the distance between the two buildings. Generally, 1M of cable is reserved in each outdoor wiring well. There are four types of cable laying methods for building subsystems: overhead wiring method, direct buried wiring method, underground pipeline wiring method and tunnel cable wiring method.
In the building complex pipeline system, the average spacing of the junction well is about 180m, or the junction well is set at the main junction point. The junction well can be prefabricated or on-site pouring. Which kind of junction well should be indicated in the structural scheme.
If it is the introduction method of underground pipelines (including the introduction method of direct buried cables or direct buried optical cables through steel pipes), it is because the introduction pipeline passes through the main body or load-bearing structure of the building. To this end, in the engineering design and construction of the integrated wiring system, it is necessary to closely contact with the housing architectural design and construction units to cooperate with the negotiation to solve the following problems.
Import restrictions by HS code category
author: 2024-12-23 21:03Composite materials HS code research
author: 2024-12-23 20:54How to reduce lead times with trade data
author: 2024-12-23 19:44HS code compliance in African unions
author: 2024-12-23 19:14Global trade management software comparison
author: 2024-12-23 19:13Long-tail trade keyword research
author: 2024-12-23 21:29Trade compliance training resources
author: 2024-12-23 21:12How to simplify HS code selection
author: 2024-12-23 20:47Exotic spices HS code classification
author: 2024-12-23 20:36242.21MB
Check855.91MB
Check926.51MB
Check849.99MB
Check414.97MB
Check525.74MB
Check821.37MB
Check312.14MB
Check449.55MB
Check228.13MB
Check317.57MB
Check593.33MB
Check968.81MB
Check862.76MB
Check587.22MB
Check375.63MB
Check118.11MB
Check913.19MB
Check984.51MB
Check398.38MB
Check727.59MB
Check143.54MB
Check923.84MB
Check691.12MB
Check438.65MB
Check796.26MB
Check822.82MB
Check893.35MB
Check121.18MB
Check771.54MB
Check214.25MB
Check533.88MB
Check187.45MB
Check569.74MB
Check336.15MB
Check346.37MB
CheckScan to install
APAC special tariff HS code listings to discover more
Netizen comments More
2843 Global trade intelligence whitepapers
2024-12-23 21:12 recommend
968 HS code guides for Middle East exporters
2024-12-23 20:34 recommend
1565 How to leverage open-source trade data
2024-12-23 20:25 recommend
1742 Country-specific HS code exemptions
2024-12-23 19:53 recommend
2455 Mineral ores HS code tariff details
2024-12-23 19:50 recommend